Ojus Sanitary Sewer Pipelines

We take immense pride in  collaborating with the Miami-Dade County Water and Sewer Department (MDWASD) to provide engineering services and sanitary sewer improvements. This transformative project is set to elevate the region’s infrastructure, providing numerous benefits to end-users and the community at large.

Scope of Work

Our dedicated team at SRS will be at the forefront of this initiative, focusing on the engineering design and preparation of construction documents. The primary goal is the construction of gravity sewer lines and force main pipelines, ensuring the seamless flow of wastewater for Miami-Dade County residents.

Services Tailored for Success

  1. Validation Expertise: Our engineers validate the Basis of Design Report (BODR) and compile a comprehensive Validation Report, complete with findings and recommendations. This meticulous process ensures the project’s alignment with the highest standards.

  2. Survey Coordination: We coordinate and review the Topographic Survey, a critical component for project accuracy. Additionally, we’ll oversee the preparation of pipeline easements across key areas, such as FEC railroad tracks and FDOT, streamlining the construction process.

  3. Subsurface Utility Engineering (SUE) and Geotechnical Investigations: SRS will oversee and coordinate SUE and Geotechnical investigations provided by MDWASD, ensuring a comprehensive understanding of the project site’s subsurface conditions and utility infrastructure.

  4. Engineering Plan Development: Our team will develop detailed engineering plans for the pipelines, submitting them in review phases at 30%, 60%, 90%, and 100%. This iterative approach allows for continuous improvement and feedback, ensuring the final plans meet the highest standards.

  5. Comprehensive Documentation: From the preparation of Contract and Bid Documents to the submission of Dry-Run Permitting Packages, including necessary permits from RER/FDEP/Department, FEC, and FDOT, we’ll ensure all aspects of the project are meticulously documented and compliant.

  6. Construction Support: SRS offers limited engineering services during the construction phase, providing invaluable expertise to address any challenges that may arise, ultimately ensuring the project stays on track.

  7. Project Schedule Management: We understand the importance of timelines. Therefore, our team will diligently update the project schedule, ensuring transparency and accountability at every stage.

Benefits to the Community

Through our collaboration with MDWASD, these improvements will result in a more efficient and reliable sanitary sewer system. The end-users, residents of Miami-Dade County, can look forward to enhanced infrastructure that promotes public health, environmental sustainability, and overall community well-being.

We are honored to contribute to the growth and progress of Miami-Dade County through this transformative project. As we embark on this journey, we remain committed to excellence, innovation, and the betterment of communities through advanced engineering solutions.

WANT TO WORK ON PROJECTS LIKE THIS?

Explore Opportunities to Join Our Growing Team!

Share this:

Like this:

Like Loading…

Discover more from SRS Engineering, Inc.

Subscribe now to keep reading and get access to the full archive.

Continue reading